Shipment of 2 x BB + 3 X 40’FR + 2 X40’HC of Steel Frame Furnace fromFOB Tekirdag Port to Kocaeli

Port of Discharge : FOB Tekirdag
Place of Unloading : : Kocaeli, Turkey
Cargo details: 2 pcs – 711,2 x 393,7 x 457,20 – 49100 kgs
11 pcs – 10.5 x 4.6 x 4.2 mt – 18500 kgs
2 pcs – 10.85 X 3.1 X 2.35 MT – 17500 kgs
2 X 40 HC

Viking completed another shipment on Saturday, 09.10.2021.
They carried 2 x BB + 3 X 40’FR + 2 X 40’HC of Steel FrameFurnace from FOB Tekirdag Port to Kocaeli Job site by 5 lowbeds+ 2 standard trucks.
Viking Project Logistics arranged lashing/securing &tarpaulin operation at the port of Tekirdag due to the damagedtarpaulin of goods.
They moved the Steel frame with dimension 2 pcs – 711,2 x 393,7x 457,20 – 49100 kgs & 10.5 x 4.6 x 4.2 mt – 18500 kgs fromport of Tekirdag to Kocaeli Job site.
The cargo was sent us by their India agency.

Well done Viking Project Logistics team!

Join Us!

You can increase your network coverage by becoming a new EPN member.

Read more

Covered Areas

One Country, one Exclusive Project Network member.

Read more

Partners

Read more