BARRUS PROJECTS – Huge transportation from St. Petersburg to Tatarstan

Barrus Projects had a huge transportation from St. Petersburg to Tatarstan. The cargo was four huge oversized reactors, and due to the challenges Barrus projects executed perfectly the transportation. 

The main ODCs were:
· First stage reactor pos. 4104R0101, 53.335 x 7.8 x 6.245 m / 1090.175 T
· Second stage reactor pos. 4104R0102, 33.844 x 7.1 x 5.096 m / 427.38 T
· Hydrodearomatisation reactor pos. 1503R0101 35.9 x 4.5 x 4.16 m / 236.14 T
· Dewaxing reactor pos. 1503R0102 20.7 x 4.5 x 4.06 m / 108.64 T

BARRUS PROJECTS had a task of providing services for the transportation of oversized heavy reactors from the manufacturing plant in Kolpino across two railway crossings PCh-10 and PCh-29, including the preparation of the necessary infrastructure for the possibility of passing in curves, transportation by inland waterways using a barge towing arrangement, as well as the delivery of reactors on self-propelled hydraulic modular trailers in Nizhnekamsk. Also, their company had to prepare the berth of the manufacturer on the Neva River to receive the largest barge shipment in history of the factory, which they successfully completed with the help from divers.

They did an awesome job.

#epn#network#barrusprojects#heavytransport#breakbulk#heavylift#projectcargo

Join Us!

You can increase your network coverage by becoming a new EPN member.

Read more

Covered Areas

One Country, one Exclusive Project Network member.

Read more

Partners

Read more